How We Help / Mold Transfer & Second Source

Mold tool transfer and second-source molding, without a supply gap

Your current molder can't hold quality, capacity, or lead time. Send the tool to the team at UTP Solutions. For tools that arrive ready to run, we typically shoot first parts within 3 business days, then requalify the process under an ISO 13485 quality system.

UTP Solutions takes over injection molding programs from other suppliers and runs them as a primary or second source. Our toolroom inspects and repairs the mold on arrival, and our engineers re-establish the process on 22T–950T presses with scientific (decoupled) molding and documented IQ/OQ/PQ support. Volumes run from about 100 parts a year to multi-million EAU, with no minimum order.

Transfer at a glance

First shotsTypically within 3 business days of tool arrival when no repairs are needed
Press range22T–950T, including vertical, two-shot and large-tonnage horizontal presses
Annual volumeAbout 100 parts a year to multi-million EAU programs · higher volumes through added cavitation and multiple tools · no minimum order quantity
Cross-press validationWhere possible, programs are validated on matched presses in the 22T, 110T, 390T, 720T and 950T ranges, so a transferred tool has a qualified backup press
Process approachScientific injection molding with decoupled process control, DOE and documented process windows
CleanroomISO Class 8 cleanroom molding and assembly
Tooling supportIn-house tool inspection, repair and modification, wire and sinker EDM, end-of-arm tooling designed and built in-house
ValidationIQ / OQ / PQ support, first article inspection, onsite QC laboratory with CMM
Quality systemISO 13485 · ISO 9001 · IATF 16949 · FDA registered
ResponseAn engineer replies within two business days

When companies move a molding program to UTP

Capacity or lead time

Your molder is booked out, missing ship dates, or can't support the next volume step.

Quality escapes

Recurring dimensional or cosmetic rejects, process drift, or findings you can't get closed.

Supplier exit

A molder is closing, being acquired, or dropping medical work, and the tool needs a new home fast.

Second source

You want a qualified backup so one supplier's problem doesn't stop your product.

Reshoring

You're moving tooling from overseas to a U.S. supply chain for continuity and control.

Supplier consolidation

You want molding, machining and assembly with one accountable partner instead of three.

How a transfer runs

1

Assessment

We review part and tool drawings, tool maintenance history, the current process sheet, material specifications, validation records and quality history. You get a straight answer on risk and timeline.

2

Transfer plan

A written plan covers bridge inventory, shipping, tool repairs, validation scope and the change-control documentation your quality system needs.

3

Tool arrival and inspection

The toolroom inspects the mold on arrival and handles repairs or modifications in-house, so nothing waits on an outside shop.

4

First shots in about 3 business days

When the tool arrives ready to run, it is typically in a press and sampling within 3 business days, so you see real parts and real data early. If repairs are needed, we complete them first and give you a firm date.

5

Process development and requalification

Engineers build a decoupled process with DOE, establish the process window, then complete first article inspection and IQ/OQ/PQ to the agreed protocol.

6

Production and continuity

SPC holds the process at volume. Inventory programs and managed supply keep you shipping while demand changes.

What to send us

You don't need all of this to start the conversation. The more we see early, the more accurate the transfer plan.

  • Part drawings and 3D models (STEP preferred)
  • Mold drawings, cavitation, and tool maintenance or repair history
  • The current process sheet and any known process issues
  • Material specification and approved resin grades
  • Existing validation documents and inspection plans
  • Annual volume, inventory on hand, and the date you need parts

Mold transfer questions

How quickly can UTP start production on a transferred mold?

When a tool arrives ready to run, first shots typically happen within 3 business days. If the tool needs repair, we schedule first shots once the repair is complete. The time to full production depends on tool condition and the validation scope in your transfer plan, which we set with you before the tool ships.

Do we have to revalidate a medical device process after a transfer?

In most medical device programs, moving to a new manufacturing site requires process requalification and a documented change assessment under your quality system. UTP supports the IQ/OQ/PQ work and first article inspection. Your regulatory team decides whether the change needs a regulatory filing.

What if the mold needs repair when it arrives?

Our in-house toolroom inspects every incoming tool and handles repair and modification, including EDM work. We flag issues during inspection and agree on the fix with you before cutting steel.

Can UTP run as a second source while our current molder keeps running?

Yes. You can qualify UTP on a duplicate tool or a split of cavities so two qualified sources are running. That protects supply if either source has a problem.

Is there a minimum order quantity?

No. Molding programs at UTP run from about 100 parts a year to multi-million EAU.

Do you take transfers outside medical devices?

Yes. We also run defense, aerospace and industrial programs under our ISO 9001 and IATF 16949 quality systems, with ITAR-compliant controls where a part requires them.

Start the transfer

Talk to an engineer, not a call center.

Tell us about the program, the tool and your deadline. A UTP engineer replies within two business days with a realistic plan.